A new bathroom, more comfortable and safer
The bathroom is the room people notice most and the one that adds most value to a holiday let. Many old baths in the south are awkward and risky for older people; replacing them with a low-profile non-slip shower tray completely changes how the bathroom is used.
Bath-to-shower conversion
- Removal of the bath and waterproofing of the area with a membrane beneath the tray.
- Made-to-measure resin tray, non-slip (class 2 or 3) and cut to the millimetre.
- Fixed or sliding tempered glass screen with anti-limescale treatment.
- Replacement of affected tiling or complete cladding of the shower area.
- Usually done in 1 to 3 days.
Complete bathroom renovation
- New plumbing and drainage, with independent shut-off valves.
- Concealed or thermostatic taps, rain shower head and niches.
- Large-format porcelain, moisture-resistant wall-hung vanity and LED mirror.
- Extraction and ventilation to prevent condensation and mould.
- Typical duration: 7 to 15 days.
We send you photos during the process, including the waterproofing before it is covered, so you have a record of what lies beneath the floor.